EnSys Yocum
Providing Software and Services for Oil Field Performance Improvement

Phone: (781) 274-8454 | Email: info@ensysyocum.net | Downstream contact: martin@tallett.co

News

Gas Injection Wells in the Ras Budran Offshore Oil Field (Gulf of Suez)

Field Background The Suez Oil Company sought to develop the offshore oil field Ras Budran located in the Gulf of Suez.  Several gas lift wells were drilled but the wells were only producing at 25 percent of design capacity.  EnSys Yocum was contracted to assist with field performance improvement. Reservoir and Well Characteristics: API 32.1˚gravity […]

Continue Reading

Accuracy of Modeling Multiphase Flow in Oil/Gas Upstream Facilities

EnSys Yocum has often been asked what type of accuracy can be achieved in simulating multiphase flow through oil wells, gas-oil separators, and surface flowlines.  This blog entry discusses the accuracy of the EnSys Yocum simulators WELLSIM, GOSPSIM, and PRODSIM and the various forms of error encountered in modeling upstream facilities. When working in the Middle East, […]

Continue Reading

Electric Submersible Pumps in the Zeit Bay Offshore Oil Field (Gulf of Suez)

The Suez Oil Company sought to develop the offshore oil field Zeit Bay (Gulf of Suez) and, in the process, encountered significant technical hurdles.  EnSys Yocum was contracted to assist with the design of the field facilities and evaluate the results of various installation options. Field Background:  The crude was 31˚ API with a gas-oil […]

Continue Reading

Scroll to Top